Another Bathroom Complete
The main bathroom remodel is now complete (except for a few things they need to do tomorrow). It took 3 weeks to complete and it looks thousands of times better.
The bathroom was stripped down to the studs. Some new features include a ceiling fan and tile. There was no ceiling fan before so the bathroom stayed pretty moist - very unpleasant. Plus it would set off the smoke alarm. The tile is a new addition - before it was linoleum and plastic shower sides. The accessories were mostly obtained from Restoration Hardware while the sink, tub, and toilet were obtained from Home Depot.